MS Student - Communication Systems at KTH, The Royal Institute of Technology
Experience:
Myson Engineering Systems (Privately Held; Telecommunications industry): Field Transmission Engineer, (January 2008-August 2009) TXN deployment as per MOBILINK plan and standards
Has done LOS surveys as per MOBILINK plan
TXN Optimization (4E1 to 16E1 & 16E1 to 48E1)
Hands on...
Linkedin